论文中文题名: | 基于BIM的军队项目设计管理研究 |
姓名: | |
学号: | 19304209002 |
保密级别: | 保密(3年后开放) |
论文语种: | chi |
学科代码: | 085213 |
学科名称: | 工学 - 工程 - 建筑与土木工程 |
学生类型: | 硕士 |
学位级别: | 工程硕士 |
学位年度: | 2022 |
培养单位: | 西安科技大学 |
院系: | |
专业: | |
研究方向: | 建筑与城市绿色环境 |
第一导师姓名: | |
第一导师单位: | |
论文提交日期: | 2022-07-04 |
论文答辩日期: | 2022-06-05 |
论文外文题名: | Research on design and management of military projects based on BIM |
论文中文关键词: | |
论文外文关键词: | BIM ; MICD ; Process innovation design ; Synergy effect evaluation ; Analytic hierarchy manner |
论文中文摘要: |
军队项目具有保密要求高、军事时效性强的特点,随着我国国防建设和改革的快速推进,对军队建设项目管理水平的要求也愈来愈高。为项目提供建设蓝图的工程设计质量与设计管理水平的高低,直接影响着军队项目建设质量的优劣。研究军队项目设计管理现状,设计适用于军队项目一体化协同设计(Integrated collaborative design of military projects,以下简称为MICD)管理需求的新体系是亟待研究的课题。 本文通过分析BIM(Building Information Modeling,简称为BIM)内涵与优势,首先梳理了项目设计管理存在的问题及军队项目的建设特点,提出引入集设计BIM与施工BIM一体的BIM咨询,以适应军队项目“强管理、弱技术”特点,更好地发挥设计在建造过程中的龙头引领作用;其次,在分析BIM带来的管理组织与沟通方式变革的基础上,本文结合项目实践,对传统项目设计流程进行优化与创新,增加BIM深化设计环节,并将BIM设计提前,制定出更加流畅、高效的设计工作流程;第三,结合军队项目管理实践中发现的问题,创造性地提出一体化BIM咨询团队应参与施工过程的项目管控,设计出基于BIM的MICD管理体系,并从实施保障、标准化建设、组织保障三个角度建立体系实施策略,以确保其在军队项目的有效落地;第四,在对已有文献总结归纳的基础上,创建了8项一级指标及22项二级指标的协同设计应用效果评价体系,同时运用层次分析法计算出各项指标的相关权重,实现了在军队项目中对协同设计应用效果进行综合化分析和定量化评价。最后,结合实际建设项目的实证案例,验证了基于BIM的MICD评价体系的可行性与可操作性。 本文以解决当前军队项目BIM应用中存在的问题为切入点,以所建立的基于BIM设计管理为模板,形成一套可复制、可推广的项目设计管理样板,以推动军队项目的BIM应用水平,提高军队项目的管理效益,实现项目增值。为以后基于BIM的施工过程管理提供了可操作的工作细节指导。 |
论文外文摘要: |
Military projects have the characteristics of high confidentiality requirements and strong military timeliness. With the rapid advancement of China’s national defense construction and reform, the requirements for the management level of military construction projects are becoming higher and higher. The engineering design quality and design management level that provide the construction blueprint for the project directly affect the quality of military project construction. It is an urgent task to study the current situation of military project design management and design a new system suitable for the management requirements of integrated collaborative design of military projects (hereinafter referred to as MICD). By analyzing the connotation and advantages of BIM (Building Information Modeling, referred to as BIM for short), this paper first sort out the problems existing in project design management and the construction characteristics of military projects, and put forward a kind of BIM consulting, which integrated BIM design and BIM construction, so as to adapt to the characteristics of “strong management and weak technology” of military projects, and give better play to the leading role of design in the construction process; Secondly, based on the analysis of the changes in management organization and communication methods brought about by BIM, this paper combined the project practice to optimize and innovate the traditional project design process, added the BIM detailed design link, and the BIM design was advanced to develop a more fluent and efficient design workflow; Thirdly, combined with the problems found in the practice of military project management, it creatively proposed that the integrated BIM consulting team should participate in the project control of the construction process, designed a BIM-based MICD management system, and established a system implementation strategy from the three aspects of implementation assurance, standardization construction, and organizational support to ensure its effective landing in military projects; Fourthly, on the basis of summarizing the existing literature, a collaborative design application effect evaluation system has been created, which contains 8 primary indicators and 22 secondary indicators. At the same time, the relevant weights of each indicator were calculated by using the analytic hierarchy process, which realized the comprehensive analysis and quantitative evaluation of the application effect of collaborative design in military projects. Finally, the feasibility and operability of the MICD evaluation system based on BIM were verified by an empirical case of an actual construction project. This paper takes the solution of the problems existing in the current BIM application of military projects as the starting point, takes the established BIM-based design management as the template, and forms a set of replicable and generalizable project design management templates, so as to promote the BIM application level of military projects, improve the management benefits of military projects, and realize projects value-added. It provides operational detailed guidance for BIM based construction process management in the future. |
参考文献: |
[1] 打造创新型“新基建”应用场赋能城市高质量发展[J]. 中国勘察设计, 2020(07): 38-41. [2] 中国建筑设计行业发展环境(2018-2019)Ⅲ[J]. 建筑设计管理, 2020, 37(11): 23-45. [3] 袁晓. 基于建筑信息模型(BIM)的建筑设计管理模式[J]. 上海建设科技, 2014(05): 61-65. [11] 何清华, 钱丽丽, 段运峰, 等. BIM在国内外应用的现状及障碍研究[J]. 工程管理学报, 2012(1): 5. [12] 张建平, 李丁, 林佳瑞, 颜钢文. BIM在工程施工中的应用[J]. 施工技术, 2012, 41(16): 10-17. [13] 王广斌, 张雷, 谭丹, 等. 我国建筑信息模型应用及政府政策研究[J]. 中国科技论坛, 2012(8): 6. [14] 薛晓娟, 赵昕, 丁洁民. 建筑信息模型在建筑结构一体化协同设计中的应用[J]. 结构工程师, 2011, 27(1): 5. [15] 张洋. 基于BIM的建筑工程信息集成与管理研究[D]. 清华大学, 2011. [16] 王广斌, 刘守奎. 建设项目BIM实施策划[J]. 时代建筑, 2013, 000(002): 48-51. [23] 季超. 基于医疗工艺的业主方医院建筑设计管理研究[D]. 北京建筑大学, 2019. [24] 李益华. 大型综合建筑项目的设计管理研究[D]. 西南交通大学, 2015. [25] 王涛. 工程项目中业主方的设计管理研究[D]. 北京建筑大学, 2020. [26] 周丹. Z公司数据中心机房项目设计管理体系改善研究[D]. 南京邮电大学, 2018. [27] 范文辉. 建筑工程设计管理体系优化研究[D]. 北京建筑大学, 2017. [28] 张丽艳. 基于后期运营的医院建筑设计管理研究[D]. 北京建筑大学, 2020. [29] 董碧满. 政府投资公共建筑项目的设计管理研究[D]. 华南理工大学, 2017. [31] General Services Administration (GSA) 3D-4D-BIM Program. https://www.gsa.gov. 2017-10-5. [33] 任延艳, 黄维, 武竞雄. 军队工程项目风险集成管理研究[J]. 军事经济研究, 2011. 32(8): 4. [34] 朱璞, 刘晓东, 郭瑞. 基于军队EPC工程总承包项目的BIM技术应用设计[J]. 项目管理技术, 2021, 19(4): 7. [35] 王洪彬, 向鹏, 张林, 等. BIM技术在军工固投建设工程中的应用[J]. 项目管理技术, 2020, 18(10): 5. [36] 马飞, 徐伟. 信息化条件下军队工程建设项目可行性研究对策建议[J]. 科技展望, 2016, 26(016): 296-296. [37] 白志伟. 新型军队工程建设管理模式研究[J]. 企业导报, 2016(14): 41. [38] 张健. BIM环境下基于建设领域本体的语义检索研究[D]. 大连理工大学, 2013. [39] 陈艳军. 基于代理的制造业信息化集成平台的研究与实现[D]. 华中科技大学, 2005. [40] 朱那新. 邰仁记. 一体化设计的关键点[J]. 中国医院建筑与装备, 2018, 19(6): 4. [43] 张乾柱, 王彤彤, 卢阳, 等. 基于AHP-GIS的重庆市山洪灾害风险区划研究[J]. 长江流域资源与环境, 2019(1): 12. [44] 陆荣欣. 建设工程BIM协同管理影响因素及分析模型研究[J]. 建筑经济, 2018, 39(4): 55-58. [45] 纪博雅, 戚振强, 金占勇. 基于外部性分析的建筑业BIM应用阻碍及对策[J]. 施工技术, 2014, 43(3): 84-87. [46] 解涛瑞, 佘健俊, 宋家仁. 基于关键成本影响因素分析的BIM应用推进对策[J]. 土木工程与管理学报, 2018, 35(1): 152-158. [47] 徐世杰. BIM技术应用面临的困难障碍分析及相关建议[J]. 施工技术, 2017, 46(S1): 496-451. [48] 马辉, 王素贞, 黄梦娇. BIM情境下利益相关者风险分担影响因素[J]. 土木工程与管理学报, 2018, 35(4): 46-52. [49] 徐友全, 孔媛媛. BIM在国内应用和推广的影响因素分析[J]. 工程管理学报, 2016, 30(2): 28-32. [50] 王鹏飞, 王广斌, 谭丹. BIM技术的扩散及应用障碍研究[J]. 建筑经济, 2018, 39(4): 12-16. [51] 刘家健. 基于BIM协同设计的效率提升因素和路径研究[D]. 重庆大学, 2018. [52] 周福萍. BIM协同设计模式下团队工作效率影响因素研究[D]. 深圳大学, 2019. [53] 任远谋. BIM在我国建筑行业应用影响因素研究[D]. 重庆大学, 2016. [54] 郄恩田, 李勇, 熊凯, 刘远明, 马彩云. 基于AHP的建筑施工企业BIM应用影响因素分析[J]. 桂林理工大学学报, 2016, 36(03): 526-532. [55] 申玲, 宋家仁, 钱经. 基于DEMATEL的BIM应用效益关键影响因素及对策[J]. 土木工程与管理学报. 2018, 35(02): 45-51. |
中图分类号: | TU201 |
开放日期: | 2025-07-03 |