- 无标题文档
查看论文信息

论文中文题名:

 红会四矿综放工作面异形煤柱条件下护巷技术研究    

姓名:

 高小明    

学号:

 G02034    

保密级别:

 公开    

学科代码:

 081901    

学科名称:

 采矿工程    

学生类型:

 工程硕士    

院系:

 能源学院    

专业:

 采矿工程    

第一导师姓名:

 伍永平    

论文外文题名:

 Study on Protecting Entry Techniques under anomalistic pillar Conditions In Hong-Hui NO.4 mine Fully Mechanized Caving Faces    

论文中文关键词:

 综放工作面 ; 异形煤柱 ; 护巷技术 ; 锚杆支护 ; 采动影响    

论文外文关键词:

 Fully mechanized caving faces ; anomalistic pillar ; protecting entry techniques    

论文中文摘要:
煤矿生产面对着各种复杂的地质条件,作业环境随时间空间不断发生变化,要求工作面布置方式和回采方式也要不断适应这种变化。综放工作面异形煤柱条件下护巷技术的研究,就是为适应矿井在复杂环境条件下正常生产需要解决的一项技术难题。 本文从解决现场实际问题出发,针对综放工作面异形煤柱特点,研究了异形煤柱和巷道围岩应力场、位移场和破坏场分布规律;有针对性地设计和采用锚杆、锚索和临时支柱等控制措施,对需要保护的巷道在关键部位和采动影响时期进行机理明确的综合加固与控制;采用多种监测技术手段,对留巷在不同煤柱宽度处围岩的压力、变形和破坏进行了现场监测,揭示了不同宽度煤柱留巷在采动影响下沿倾斜和走向方向岩层压力分布、巷道围岩移动变形与破坏的演化规律,取得了良好的支护效果,并为今后类似条件下的工程设计、施工和管理提供了科学依据。
论文外文摘要:
The coal mine production faces various complicated geology conditon,working environment changes continuously with time and space,so it is necessary to make the way of face layouting and mining to adapt this kind of variety.The purpose of researching protecting entry techniques under anomalistic pillar conditions in Fully Mechanized Caving Faces is to solve the technical problems that making the mine to product properly on complicated conditions. Based on solving the field problem,and aiming at the characteristics of anomalistic pillar,the distributional regularities of stress,displacement and failure area are researched;Through point design and employing some control methods,such as cable,anchorage cable and temporary brace etc.,the critical region of some openings,which are needed to protect during the caving influence times,are strengthened and controlled comprehensively depending on sxplicit mechanism;the stress,strain and failure of surrounding rock,belonging to reserved entry near the anomalistic pillar,are surveyed by multi-survey techniques in the field.and the results indicate the distributional regularities of tress along the dip and strike,and the space-time evolvement regularities between distortion and failure in the surrounding rock of different width pillar reserved entry under the caving influence.This techinque proved in the practice can achieve sateisfying support effect, and also afford a seientific accordance to the project design,construction and management under similar conditions.
中图分类号:

 TD353    

开放日期:

 2008-04-28    

无标题文档

   建议浏览器: 谷歌 火狐 360请用极速模式,双核浏览器请用极速模式